🐂 Not all bull runs are created equal. November’s AI picks include 5 stocks up +20% eachUnlock Stocks

NASA nears second attempt to launch Artemis moon rocket on debut test flight

Published 09/02/2022, 02:34 PM
Updated 09/02/2022, 10:10 PM
© Reuters. NASA's next-generation moon rocket, the Space Launch System (SLS) with the Orion crew capsule perched on top, stands on launch complex 39B as rain clouds move into the area before its rescheduled debut test launch for the Artemis 1 mission at Cape Canaver
BA
-
LMT
-
PSN
-

By Joe Skipper and Steve Gorman

CAPE CANAVERAL, Fla. (Reuters) - Ground teams at Kennedy Space Center in Florida on Friday began a final full day of launch preparations on the eve of a second attempt to send NASA's giant, next-generation moon rocket on its debut test flight, five days after technical problems foiled an initial try.

Mission managers were still "go" for a Saturday afternoon liftoff of the 32-story-tall Space Launch System (SLS) rocket and its Orion space capsule to kick off NASA's moon-to-Mars Artemis program, successor to the Apollo lunar missions a half-century ago, NASA officials said.

Tests conducted Thursday night showed technicians appeared to have fixed a leaky fuel line that contributed to NASA's decision to halt Monday's initial launch operation, Jeremy Parsons (NYSE:PSN), a deputy program manager at the space center, told reporters on Friday.

Two other key issues on the rocket itself - a faulty engine temperature sensor and some cracks in insulation foam - have largely been resolved, Artemis mission manager Mike Sarafin told reporters Thursday night.

Melody Lovin, a launch weather officer for the U.S. Space Force in Cape Canaveral, said forecasts called for a 70% chance of favorable conditions during the two-hour Saturday launch window, which opens at 2:17 p.m. EDT (1817 GMT), as well as for a backup launch time on Monday.

"The weather continues to still look pretty good for the launch attempt on Saturday," Lovin said. "I do not expect weather to be a show-stopper by any means for either launch window."

Still, she added, the odds of scrubbing a launch on any given day for weather or any reason were about one-in-three.

The mission, dubbed Artemis I, marks the first voyage for both the SLS rocket and the Orion capsule, built under NASA contracts with Boeing (NYSE:BA) Co and Lockheed Martin Corp (NYSE:LMT), respectively.

The SLS is set to launch Orion around the moon and back on a 37-day, uncrewed test flight designed to put both vehicles through their paces before flying astronauts in a subsequent mission targeted for 2024.

If the first two Artemis missions succeed, NASA is aiming to land astronauts back on the moon, including the first woman to set foot on the lunar surface, as early as 2025, though many experts believe that time frame is likely to slip by a few years.

Twelve astronauts walked on the moon during six Apollo missions from 1969 to 1972, the only spaceflights yet to place humans on the lunar surface.

Apollo grew out of the U.S.-Soviet space race of the Cold War era, while NASA's renewed lunar focus is driven more by science and encompasses international partnerships with the space agencies of Europe, Japan and Canada, and with commercial rocket ventures such as SpaceX.

Unlike Apollo, the latest flights to the moon are aimed at establishing a long-term, sustainable base of operations on the lunar surface and in lunar orbit as a stepping stone for eventual human expeditions to Mars.

NASA's first step is getting off the ground with the SLS, the biggest new vertical launch system the U.S. space agency has built since the Saturn V rocket of the Apollo era.

If the Artemis I mission is postponed again for any reason, NASA could try again either on Monday or Tuesday. After that, regulations limiting how long a rocket can remain at its launch tower would likely require the spacecraft to be rolled back to its assembly building before another liftoff attempt, Parsons said. Such a move would involve a more extended delay than a few days or a week.

© Reuters. NASA's next-generation moon rocket, the Space Launch System (SLS) with the Orion crew capsule perched on top, stands on launch complex 39B as rain clouds move into the area before its rescheduled debut test launch for the Artemis 1 mission at Cape Canaveral, Florida, U.S. September 2, 2022.  REUTERS/Joe Skipper

The SLS and Orion have been under development for more than a decade, with years of delays and ballooning costs that have run to at least $37 billion as of last year. But the Artemis program also has generated tens of thousands of jobs and billions of dollars in commerce for the aerospace industry, according to NASA.

(This story corrects day of fuel line tests to Thursday night in paragraph 3).

Latest comments

Risk Disclosure: Trading in financial instruments and/or cryptocurrencies involves high risks including the risk of losing some, or all, of your investment amount, and may not be suitable for all investors. Prices of cryptocurrencies are extremely volatile and may be affected by external factors such as financial, regulatory or political events. Trading on margin increases the financial risks.
Before deciding to trade in financial instrument or cryptocurrencies you should be fully informed of the risks and costs associated with trading the financial markets, carefully consider your investment objectives, level of experience, and risk appetite, and seek professional advice where needed.
Fusion Media would like to remind you that the data contained in this website is not necessarily real-time nor accurate. The data and prices on the website are not necessarily provided by any market or exchange, but may be provided by market makers, and so prices may not be accurate and may differ from the actual price at any given market, meaning prices are indicative and not appropriate for trading purposes. Fusion Media and any provider of the data contained in this website will not accept liability for any loss or damage as a result of your trading, or your reliance on the information contained within this website.
It is prohibited to use, store, reproduce, display, modify, transmit or distribute the data contained in this website without the explicit prior written permission of Fusion Media and/or the data provider. All intellectual property rights are reserved by the providers and/or the exchange providing the data contained in this website.
Fusion Media may be compensated by the advertisers that appear on the website, based on your interaction with the advertisements or advertisers.
© 2007-2024 - Fusion Media Limited. All Rights Reserved.